人人妻一区二区三区-人人妻在人人-人人人妻人人澡人人爽欧美一区-人人揉人人捏人人添-人人揉揉香蕉-人人入人人爱

AC source power & DC source power manufacturing factory

Test Application on AC Contactor

AC contactor is a switching device which uses electromagnetic force and spring elastic force to connect and break contacts to control the on-off of load circuit. It is suitable for frequent operation and long-distance control. It is an important component of automatic control circuit system. With the growth of national economic demand and power industry, the demand for AC contactors continues to grow, and competition is increasingly fierce. In order to ensure product quality, the testing of AC contactors is particularly important.

Following will take AC contactor test requirements as an example to introduce AC contactor test scheme in detail.
Before starting the test, we first understand its working principle: when the AC contactor's attraction coil is electrified, the static iron core produces electromagnetic attraction, the armature is absorbed, and the connecting rod connected with the armature drives the contact action, so that the normally closed contacts are disconnected, and the often open contacts are closed, both of them are linked, and the contactor is in the electrified state; When the coil is cut off, the electromagnetic suction disappears, the armature is released under the action of spring, which makes the normally closed contacts closed, the often open contacts disconnected, and the contactor is in a state of power loss.

The client test requirements are as follows: 

1. ON/OFF test: Set ON/OFF AC voltage (rated voltage), starting angle 90 degrees, termination angle 0 degrees, ON/OFF twice, and finally OFF.            
2. Characteristic test: setting voltage (rated voltage), starting angle 30 and termination angle 90 and output ON. Read peak current immediately, delay 500 ms, read and maintain current, maintain power consumption, and finally OFF.           
3. Suction voltage test: first set the suction start voltage (20% of rated voltage), output to ON, then every 200 ms, the voltage rises in accordance with 5V step up to suction, read the suction voltage, and finally output OFF.            
4. Release Voltage Test: First set the release starting voltage (rated voltage), output to ON, set the release voltage (rated voltage 68%) and then every 200 ms, the voltage descends according to 5V step to read the release voltage after release; finally output the OFF.

Among them:
Test requirements 1,2, can be achieved by the panel setting function of ADMIRE POWER standard AC power supply APA1000 series . This function can be set voltage, frequency, starting phase angle and terminating phase angle. The range of setting phase angle is 0-360.

Test requirements 3,4, can be achieved through the ADMIRE POWER standard AC power APA1000 series power supply internal test group, the function can be set up 35 test points to set the starting voltage value, termination voltage value, step voltage value, start frequency, termination frequency and single step time, so that the power supply voltage and time Frequency varies in a step-by-step fashion. If the 35 test points are not enough, the intelligent AC power supply APA2000 series (touch screen display) can provide five test groups, each of which has 35 test points, and each test point can set different voltage, frequency and time.

Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
主站蜘蛛池模板: 天堂网在线观看 | 成人 亚洲| 青青国产成人久久激情911 | 亚洲免费一区二区 | 欧美另类高清xxxxx | 国产五月婷婷 | 国产香蕉一区二区在线观看 | 99爱在线精品视频免费观看9 | 视频在线欧美 | 95视频在线观看在线分类h片 | 成人影院观看 | 黄色成人免费网站 | 女性特黄一级毛片 | youjizz欧美粗又大中国 | 免费在线一级片 | 天天插天天操天天射 | 色综久久 | 中国一级毛片录像 | 国产欧美一区视频在线观看 | 亚洲精品国产国语 | 成人a视频片在线观看免费 成人a视频在线观看 | 欧美操人视频 | 日韩亚洲第一页 | 午夜欧美精品久久久久久久久 | 日韩一区二区三区在线 | 国产精品一区二区三区久久 | 久久99热只有频精品6不卡 | 2019天天干天天操 | 日本精品高清一区二区不卡 | 色综合久久综合欧美综合 | 久久久久依人综合影院 | 高清视频在线播放 | 高清国产一区二区三区 | 亚洲精品一区二区三区在线播放 | 四虎激情 | 国产精品久久久久影院免费 | 免费国产阿v视频在线观看 免费国产不卡午夜福在线 免费国产不卡午夜福在线观看 | 波多野结衣中文字幕一区 | 欧美精品亚洲精品日韩专区 | 日韩在线观看一区 | 一级毛片免费毛片一级毛片免费 |